Sl compulsory Expecting 25% upside in next 5 months Support play. Hence volume appear after breakout.
Pin bar with volume looks to have a reversal at the base SL below the pin bar Moreover, it is supported by cnx pharma index also forming pin bar When sectorial index and individual stocks are aligned in the same manner; then the stock may rise in intraday for 2%.
SL compulsory Duration 3 days to 2 weeks upside potential of 5% in 2 weeks
SL compulsory red volume bar Long above 555 to 630 (target) Duration 4 weeks
SL Compulsory volume support the price hike Duration: 5 days w formation
There is a possibility of short but the ideal entry for short position will be wick reversal point of day before yesterday low as short point in daily chart. if any pull back at 18200 level would be good opportunity for short with Sl as yesterdays high. SL compulsory duration 2 to 3 days only.
Reason for buy are 1. daily chart, the price first time touched to 25 ema. 2.expecting small reversal in nifty at 18100 level for bounce back 3.vix is parabolic
SL compulsory Duration 3 weeks volume should not consider in this reversal play. SL compulsory
SL compulsory Duration 4 days volume supports the price breakout
SL compulsory Duration 5 days volume supports the price hike
Above the consolidation zone is long possible build up SL is wick low. Duration 5 to 7 days.
It looks HSP will fail to make another 5 t 10% up in next 7 days Sl compulsory Qty not more than 1% of total investment
Another 10% upside potential is still left Any pull back is buy opportunity Volume supports the price hike. Duration : 4 weeks for 10% upside potential SL compulsory
SL compuslory Duration : 3 weeks 5 to 7 % upside potential Volume supports the price hike
Look the wick like pull back in shorter time frame. or it may be the reversal as well. So SL compulsory Duration 5 day for 5% upside potential Pre-budget rally possible.
SL Compulsory Duration: 1 year for long term target 5 to 10% within the range is good thing to gain in 3 weeks Qty within the 1% of total investment
SL compulsory Duration 5 to 6 months it may even touch below fib level
SL Compulsory Duration : 6 months to 1 year HSP breakout with volume